能力成熟度整合模式 CMMI
(Capability Maturity Model Integration 能力成熟度整合模式)
By the Software Engineering Institute (SEI) at Carnegie Mellon University.
2002, CMMI Version 1.1 was released.
Version 1.2 followed in August 2006.
Version 1.3 will be released in November 2010.
http://www.sei.cmu.edu/cmmi/
7 Process Areas of CMMI Level 2
經濟部工業局提升資訊軟體品質計畫 http://www.cmmi-taiwan.org.tw
(Capability Maturity Model Integration 能力成熟度整合模式)
By the Software Engineering Institute (SEI) at Carnegie Mellon University.
2002, CMMI Version 1.1 was released.
Version 1.2 followed in August 2006.
Version 1.3 will be released in November 2010.
http://www.sei.cmu.edu/cmmi/
7 Process Areas of CMMI Level 2
- PP (Project Plan)
- CM (Configuration Management)
- REQM (Requirements Management)
- MA (Measurement and Analysis)
- PMC (Project Monitor and Control)
- SAM (Supplier Agreement Management)
- PPQA (Process and Product Quality Assurance)
經濟部工業局提升資訊軟體品質計畫 http://www.cmmi-taiwan.org.tw